Skip to content
2 min read

Powering the Future with Customised Solutions: The MacIntyre Wind Farm Project

Company Acciona
Location 50 kms south-west of Warwick
Timeline TBC
Project Overview SGSU Power Transformers 
Products
  • 330kV Disconnectors
  • 330kV Current Transformers
  • 72.5kV DTCB

 

5e74f20f027e86393e6c82d7dbffa061

Project Overview

When the team at the MacIntyre Wind Farm in southern Queensland set out to expand its renewable energy capabilities, it was clear a partner was needed who could deliver specialised equipment and responsive support. It found that partner in Insulect.

Insulect was contracted to supply a range of critical substation components for the MacIntyre project, including 33kV disconnectors, current transformers, and the all-important dead tank circuit breakers. Recognising the unique requirements of this two-stage wind farm development, Insulect engineers worked closely with the customer to ensure the equipment would seamlessly integrate with the site's specific configuration.

The Insulect team went above and beyond, sending technicians to the site to provide hands-on installation support and guidance. This personal touch was greatly appreciated by the customer, who, thanks to Insulect's expertise and dedication, was able to effectively get the equipment up and running smoothly and on schedule.

The MacIntyre Wind Farm project was a resounding success, thanks in large part to Insulect's ability to deliver customised solutions and their unwavering commitment to the customer's needs.

Challenges

  • The requirement for hands-on technical support and expertise to be provided on-site to assist the customer with the installation and commissioning process.

Benefits to client

  • Insulect's ability to deliver customised, tailored solutions that meet the specific needs of the project rather than just offering off-the-shelf products.
  • The responsive and hands-on local support provided by Insulect, including regular communication and on-site technical assistance, which helped the client successfully navigate installation.

Critical Sucess Factors

  • Insulect ability to provide customised solutions to meet the specialised requirements of the substation configuration.
  • The regular communication and status updates provided to the client through the fortnightly meetings helped manage expectations and keep the client informed every step of the way.
  • Insulect provided on-site support and installation assistance, including sending a technician from China to help with the commissioning process.
  • Insulects responsiveness in resolving issues during the project demonstrates their commitment to the client's success.
  • The strong working relationship and collaboration between Insulect, the client, and the various suppliers involved in the project.
  • These critical success factors allowed Insulect to navigate the project's challenges, deliver a positive outcome, meet deadlines and nurture a strong, ongoing relationship with the client.