Powering Up Tallawarra: Delivering Specialised Solutions for a Critical Energy Upgrade

Written by Admin | 22 Nov 2024
Company Energy Australia
Location Yallah, NSW
Timeline TBC
Project Overview The Tallawarra Power Station project involved the supply of critical electrical equipment to support upgrades at this major energy facility the team were also tasked with delivering a specialised device for frequency control and ancillary service monitoring.
Products
  • 132 KV Disconnectors
  • IDM+
  • Storage racking
  • Installation
  • Monitoring

 

 

Project Overview

The Tallawarra Power Station project involved the supply of critical electrical equipment to support upgrades at this major energy facility. The team was also tasked with delivering a specialised device for frequency control and ancillary service monitoring.

This project presented unique challenges and opportunities for Insulect to demonstrate its adaptability, efficiency and cost-optimisation strategies. Insulect took a distinct to this project given the clients unique needs, by shipping the entire cubicle containing the IDM Plus device from their Belfast, UK facility to the customer in Australia, deviating from the usual practice of shipping only the device and leaving cubicle assembly to the EPC contractor.

This project demanded a dedicated cubicle for the IDM Plus device, as opposed to the usual practice of housing multiple devices in a single cubicle, showcasing Insulect’s flexibility and attention to detail. Despite the additional shipping costs, the decision to assemble and ship the complete cubicle from Belfast was more cost-effective than local assembly in Australia.

Insulect’s successful completion of the Tallawarra project highlighted their problem-solving skills and dedication to providing tailored solutions that meet customer needs. This project exemplifies Insulect’s adaptability, cost-optimisation strategies, and commitment to delivering innovative solutions.

Project Challenges

  • Meeting the client's stringent technical requirements and timelines
  • Fulfilling the specialised needs of GE for a customised monitoring solution/setup

Benefits to client

  • Tailored and cost-optimised solution delivery: Insulect provided a specialised device customised to the client's requirements while leveraging their global resources to deliver a more cost-effective solution.

Critical Success Factors

  • Insulects proven history of providing excellent technical support and going above and beyond for the client.
  • Insuects willingness to provide ongoing care and maintenance, including monthly remote monitoring and health checks. This showed the brands commitment to ensuring the long-term success of the project.
  • Insulects ability to understand the client's needs and requirements, and then deliver a tailored solution that met those needs, even though the technical specifications were complex.